Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

19 unique locations (81 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (6 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. (2)
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Combined Cycle Gas Turbine (CCGT) Willington Power Limited WILLINGTON C CCGT WILLINGTON C CCGT +1 more Not Prequalified DE65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (4 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY EXPANSION LIMITED Spalding Energy Expansion Spalding Energy Expansion +1 more PE11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (2 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Severn Power Station West Nash Road Newport NP18 2BZ (6 components)

Existing CCGT unit (3)

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Power Unit 10 Severn Power Unit 10 +2 more NP18
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Active • 2025-26 (T-4), 2021-22 (T-4) ...
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit (2)
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Combined Cycle Gas Turbine (CCGT) Knottingley Power Limited Knottingley Unit 1 Knottingley Unit 1 +2 more WF11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• New build Combined Cycle Gas Turbine plant (2)
• Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (2 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Combined Cycle Gas Turbine (CCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Gateway Energy Centre SS17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (8 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
753.64 MW
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (6 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1283.00 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (4 components)

Combined Cycle Gas Turbine plant (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1509.60 MW
ASHLAND FARM BECK LANE SKEGBY SUTTON IN ASHFIELD NG19 6PG (3 components)

NEW BUILD GAS FUELLED GENERATING STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
27.90 MW
Loading map...
Showing 19 locations