Open Cycle Gas Turbine (OCGT)

34 unique locations (211 components) - Page 1 of 2

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (4 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY EXPANSION LIMITED Spalding Energy Expansion Spalding Energy Expansion +1 more PE11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Severn Power Station West Nash Road Newport NP18 2BZ (6 components)

Existing CCGT unit (3)

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Power Unit 10 Severn Power Unit 10 +2 more NP18
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Active • 2025-26 (T-4), 2021-22 (T-4) ...
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)

Gas Fired Generating Station (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (3 components)

NEW BUILD GAS GENERATION STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit (2)
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Combined Cycle Gas Turbine (CCGT) Knottingley Power Limited Knottingley Unit 1 Knottingley Unit 1 +2 more WF11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• New build Combined Cycle Gas Turbine plant (2)
• Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B. (2)
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (2 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire. (3)

Combined Cycle Gas Turbine (CCGT) Powersite DL Ltd Powersite DL Ltd Powersite DL Ltd +3 more Not Prequalified DE15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Combined Cycle Gas Turbine (CCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Gateway Energy Centre SS17
Inactive • 2021-22 (T-4), 2020-21 (T-4)