Open Cycle Gas Turbine (OCGT)

22 unique locations (83 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
ASHLAND FARM BECK LANE SKEGBY SUTTON IN ASHFIELD NG19 6PG (3 components)

NEW BUILD GAS FUELLED GENERATING STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (10 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility. (2)
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Basin Road South. Portslade. East Sussex. BN41 1WF (4 components)

Combined Cycle Gas Turbine plant (3)

OCGT Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Shoreham Shoreham +1 more BN41
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (6 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

OCGT Combined Cycle Gas Turbine (CCGT) CENTRICA BARRY LIMITED Existing Generating CMU Barry Barry +1 more CF64
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (8 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• New build Combined Cycle Gas Turbine plant (2)
• Combined Cycle Gas Turbine plant
OCGT Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP18DC) (1 component)

New build Combined Cycle Gas Turbine plant

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Conditional ME3
Inactive • 2022-23 (T-4)
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant (2)

Open Cycle Gas Turbine (OCGT) BOTLEY ENERGY LIMITED New Build Generating CMU BOT111 SO52
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (3 components)

NEW BUILD GAS GENERATION STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land at Hoon Hay Farm Marston Lane Hatton Derby DE65 5EA (1 component)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) HATTON FARM ENERGY LIMITED New Build Generating CMU Conditional DE65
Inactive • 2022-23 (T-4)
Land off Bicester Road Bicester Oxfordshire OX26 6EP (1 component)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) SOLARDEV 3 LTD New Build Generating CMU Conditional OX26
Inactive • 2022-23 (T-4)
Land West of Yelland Quay, West Yelland, Yelland, Barnstaple, EX31 3HB (1 component)

10 x 2MW gas reciprocating engines used for power generation, with associated infrastructure.

Open Cycle Gas Turbine (OCGT) Gas Generation Castlebridge Limited New Build Generating CMU Gas Generation Yelland Conditional EX31
Inactive • 2022-23 (T-4)
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF. (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill BB2
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)

Gas Fired Generating Station (3)

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) Meaford Energy Limited New Build Generating CMU Meaford Generating Station Meaford Generating Station +2 more ST15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Open Cycle Gas Turbine (OCGT) ENERSYST LIMITED New Build Generating CMU Rockingham 2MW Conditional BS11
Inactive • 2022-23 (T-4)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC New Build Generating CMU CMU_FERR18 Conditional WF11
Inactive • 2022-23 (T-4)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
OCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 CMU_SEALS-1 +1 more TS2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Severn Power Station West Nash Road Newport NP18 2BZ (6 components)

Existing CCGT unit (3)

CCGT Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Power Unit 10 Severn Power Unit 10 +2 more NP18
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited New Build Generating CMU Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (6 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. (2)
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Combined Cycle Gas Turbine (CCGT) Willington Power Limited New Build Generating CMU WILLINGTON C CCGT WILLINGTON C CCGT +1 more Not Prequalified DE65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 22 locations