{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

7 unique locations (36 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (3 components)

A series of gas generators on an existing site. (3)

Active • 2026-27 (T-4), 2024-25 (T-1) ...
56.94 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Open Cycle Gas Turbine (OCGT) ALKANE ENERGY UK LIMITED Existing Generating CMU Redditch Redditch B97
Active • 2024-25 (T-1), 2023-24 (T-1) ...
46.34 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (16 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Coal Open Cycle Gas Turbine (OCGT) UNIPER UK LIMITED Existing Generating CMU Ratcliffe GT2 Ratcliffe GT2 +13 more NG11
Active • 2025-26 (T-1), 2023-24 (T-1) ...
475.11 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)

Existing Gas Engine (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.22 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (2 components)

Existing OCGT. (2)

Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Exeter Power Exeter Power EX2
Inactive • 2023-24 (T-1), 2022-23 (T-1)
41.91 MW
Huntsman Drive, Seal Sands, TS2 1TT (2 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
64.03 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (4 components)

One (1) Open Cycle Gas Turbine MSID: 7382 (3)

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CMU_CHEGT1 +2 more CH65
Active • 2025-26 (T-1), 2024-25 (T-1) ...
124.05 MW
Loading map...
Showing 7 locations