{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

6 unique locations (33 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (3 components)

Existing CCGT (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
1551.59 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (3 components)

Existing CCGT Unit (2)

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Unit 10 Severn Unit 20 +1 more NP18
Active • 2025-26 (T-1), 2024-25 (T-1)
1551.59 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (16 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Coal Open Cycle Gas Turbine (OCGT) UNIPER UK LIMITED Ratcliffe GT2 Ratcliffe GT2 +13 more NG11
Active • 2025-26 (T-1), 2023-24 (T-1) ...
475.11 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (4 components)

One (1) Open Cycle Gas Turbine MSID: 7382 (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
124.05 MW
Loading map...
Showing 6 locations