Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

144 unique locations (1499 components) - Page 2 of 6

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (15 components)
• Existing CCGT Unit (2)
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Refurbishing Generating CMU Severn Unit 1 and 2 Severn Unit 10 +7 more NP18
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Severn Power Station West Nash Road Nash Newport NP18 2BZ (3 components)

Existing CCGT Unit (2)

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Unit 10 Severn Unit 20 +1 more NP18
Active • 2025-26 (T-1), 2024-25 (T-1)
1551.59 MW
Severn Power Station West Nash Road Nash Newport Gwent NP18 2BZ (2 components)
• Existing CCGT that is to be refurbished
• Refurbishment of existing plant
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Refurbishing Generating CMU Severn Unit 1 and 2 Severn Unit 20 NP18
Active • 2027-28 (T-4), 2025-26 (T-4)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
OCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 CMU_SEALS-1 +1 more TS2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2020-21 (T-1)
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (10 components)

Single Shaft CCGT (Module 2) (3)

Combined Cycle Gas Turbine (CCGT) SEABANK POWER LIMITED Existing Generating CMU Seabank 1 and 2 Seabank 1 and 2 +1 more BS10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1141.17 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (10 components)

Multi Shaft CCGT (Module 1) (3)

Combined Cycle Gas Turbine (CCGT) SEABANK POWER LIMITED Existing Generating CMU Seabank 1 and 2 Seabank 1 and 2 +1 more BS10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2260.43 MW
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC New Build Generating CMU CMU_FERR18 Conditional WF11
Inactive • 2022-23 (T-4)
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) RWE GENERATION UK PLC Existing Generating CMU New Build Generating CMU CMU_HYTHE CMU_HYTHE +1 more SO45
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Rosper Road Immingham North Lincolnshire DN40 3DZ (2 components)
• New build open cycle gas turbine
• New build open cycle gas turbine generating plant
Open Cycle Gas Turbine (OCGT) VPI IMMINGHAM B LIMITED New Build Generating CMU VPI B OCGT VPI B OCGT DN40
Active • 2025-26 (T-4), 2024-25 (T-4)
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Open Cycle Gas Turbine (OCGT) ENERSYST LIMITED New Build Generating CMU Rockingham 2MW Conditional BS11
Inactive • 2022-23 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Storage Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) ENERSYST LIMITED New Build Generating CMU Rockingham Battery Rockingham Ext +3 more Not Prequalified BS11
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

OCGT Open Cycle Gas Turbine (OCGT) ALKANE ENERGY UK LIMITED Existing Generating CMU Redditch Redditch B97
Active • 2025-26 (T-4), 2021-22 (T-4) ...
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Open Cycle Gas Turbine (OCGT) ALKANE ENERGY UK LIMITED Existing Generating CMU Redditch Redditch B97
Active • 2024-25 (T-1), 2023-24 (T-1) ...
46.34 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (44 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.19 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (16 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Coal Open Cycle Gas Turbine (OCGT) UNIPER UK LIMITED Existing Generating CMU Ratcliffe GT2 Ratcliffe GT2 +13 more NG11
Active • 2025-26 (T-1), 2023-24 (T-1) ...
475.11 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) PROGRESS POWER LIMITED New Build Generating CMU Progress Power OCGT Progress Power OCGT +2 more IP23
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (50 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components)

Peterhead CCGT (3)

Combined Cycle Gas Turbine (CCGT) SSE THERMAL GENERATION (SCOTLAND) LIMITED Existing Generating CMU Peterhead Peterhead +12 more AB42
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3242.27 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (4 components)

Existing OCGT plant. (3)

Open Cycle Gas Turbine (OCGT) RIVER NENE POWER LIMITED Existing Generating CMU Peterborough Power Peterborough Power +2 more PE1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
690.18 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (50 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
CCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_PEMB-11 CMU_PEMB-11 +43 more SA71
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6183.38 MW
Newton Aycliffe CO Durham DL5 6EA (9 components)

Existing Gas Engine (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.78 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)

Existing Gas Engine (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.22 MW
Loading map...
Showing 25 locations