Onshore Wind

12 unique locations (38 components)

Active MW: 498.16 MW
Inactive MW: 2.34 MW
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
• The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Onshore Wind WEST BENHAR WINDFARM PARTNERSHIP LLP New Build Generating CMU West Benhar West Benhar Windfarm +1 more ML7
Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.58 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (1 component)

1 x 4.2MW Onshore Wind Turbine Generator

Onshore Wind WATSON HEAD WIND FARM LIMITED New Build Generating CMU Watson Head ML2
Active • 2026-27 (T-4)
0.28 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (1 component)

1 x Wind Turbine Generating Unit

Onshore Wind WATSON HEAD WIND FARM LIMITED New Build Generating CMU Watson Head ML2
Active • 2026-27 (T-4)
0.28 MW
Pearie Law, West Calder, West Lothian, EH55 8LT (4 components)

1 x Wind Turbine Generator

Onshore Wind PEARIE LAW II WIND FARM LTD New Build Generating CMU Pearie Law II EH55
Active • 2026-27 (T-4)
1.40 MW
Hazelside, Glespin, Lanark, Scotland, ML11 0RL (8 components)

13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW (3)

Onshore Wind DOUGLAS WEST WIND FARM LTD Existing Generating CMU Douglas West wind farm Douglas West wind farm +2 more ML11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.88 MW
4.13 MW
Enoch Hill Wind Farm, Dalleagles, connecting via New Cumnock Substation, Cummnock, KA6 7PT (1 component)

The BMU is a Wind farm consisting of up to 16 wind turbines and associated infrastructure consisting of access tracks , substation and array cables

Onshore Wind RWE RENEWABLES UK LIMITED New Build Generating CMU Rejected KA6
Active • 2026-27 (T-4)
4.65 MW
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0EL (3 components)

New build onshore wind farm. (3)

Onshore Wind DALQUHANDY WIND FARM LIMITED New Build Generating CMU Dalquhandy Dalquhandy ML11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.28 MW
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (4 components)
• Existing generation windfarm. (2)
• New build windfarm.
Onshore Wind CUMBERHEAD WIND ENERGY LIMITED New Build Generating CMU CumberheadWF CumberheadWF +1 more ML11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
15.53 MW
Craigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, Scotland (6 components)

9-turbine wind farm located in Scotland with the installed capacity of 37.800MW (3)

Onshore Wind TWENTYSHILLING LIMITED Existing Generating CMU Twentyshilling Wind Farm Twentyshilling wind farm +1 more DG4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.90 MW
C35, DG7 3UF, Castle Douglas , Scotland (4 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW (3)

Onshore Wind WINDY RIG WIND FARM LIMITED Existing Generating CMU Windy Rig wind farm Windy Rig wind farm DG7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.00 MW
Brownhill Farm, West Benhar Road, Eastfield, Harthill, Shotts, North Lanarkshire, ML7 5TG (2 components)
• 1 Wind Turbine Generator
• 1 x Wind Turbine Generator
Onshore Wind BROWNHILL WIND FARM LTD New Build Generating CMU Brown Hill ML7
Active • 2026-27 (T-4)
0.57 MW