Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

102 unique locations (1526 components) - Page 3 of 5

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components) Geocoding Needed
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component) Geocoding Needed

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
0.95 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components) Geocoding Needed
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Damhead Creek Damhead Creek +9 more ME3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8593.66 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components) Geocoding Needed
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Combined Cycle Gas Turbine (CCGT) EP UK POWER DEVELOPMENT LTD New Build Generating CMU King's Lynn B King's Lynn B +4 more PE34
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6895.24 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (56 components) Geocoding Needed
• Connah's Quay PS Unit 1 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Combined Cycle Gas Turbine (CCGT) UNIPER GLOBAL COMMODITIES SE Existing Generating CMU Connahs U1 Connahs U1 +27 more CH5
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5906.72 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (26 components) Geocoding Needed
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT) KEADBY GENERATION LIMITED Existing Generating CMU Keadby 1 and GT3 Keadby 1 and GT3 +13 more DN17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11058.82 MW
Indian Queens Power Station, St. Dennis, St. Austell, PL26 8BY (11 components) Geocoding Needed
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1326.91 MW
Hythe Power Station, Charleston Road, Hardley, Hythe, Southampton, SO45 3BP (8 components) Geocoding Needed
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2028-29 (T-4), 2027-28 (T-4) ...
361.68 MW
Huntsman Drive, Seal Sands, TS2 1TT (2 components) Geocoding Needed

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
64.03 MW
Huntsman Drive, Seal Sands, TS2 1TT (2 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
64.03 MW
Great Yarmouth Power Station, South Denes Road, Great Yarmouth, Norfolk, NR30 3PY (11 components) Geocoding Needed
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3337.20 MW
Fort Parkway, Heartlands, Birmingham, B24 9QT (22 components) Geocoding Needed
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Reciprocating engines Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Heartlands Power Heartlands Power +4 more B24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
909.77 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (73 components) Geocoding Needed
• GT3
• Generating Unit 1
• Generating Unit 2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7352.06 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (52 components) Geocoding Needed
• GT5
• GT8
• Unit 4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Factory Lane, Croydon, Surrey, CR0 3RL (7 components) Geocoding Needed

Existing OCGT.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.86 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (3 components) Geocoding Needed

EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1854.88 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components) Geocoding Needed
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd EP SHB LIMITED Refurbishing Generating CMU T_SHBA-1 T_SHBA-2 +2 more DN41
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1311.99 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (8 components) Geocoding Needed

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP LANGAGE LIMITED Existing Generating CMU T_LAGA-1 PL7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2269.66 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW (2 components) Geocoding Needed

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP LANGAGE LIMITED Refurbishing Generating CMU T_LAGA-1 PL7
Active • 2028-29 (T-4)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components) Geocoding Needed

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1260.00 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components) Geocoding Needed

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1260.00 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components) Geocoding Needed
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
• New build gas-fired generation at Eggborough power station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11967.48 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components) Geocoding Needed
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-20= 100% T_WBURB-3
Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +7 more DN22
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3738.15 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (46 components) Geocoding Needed
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-1 = 100% (T_WBUGT-1)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Coal Open Cycle Gas Turbine (OCGT) EDF ENERGY (THERMAL GENERATION) LIMITED Existing Generating CMU West Burton A Power Station CMU 1 West Burton A Power Station CMU 1 +11 more DN22
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3081.02 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (44 components) Geocoding Needed
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Coal OCGT Coal/biomass Open Cycle Gas Turbine (OCGT) DRAX POWER LIMITED Existing Generating CMU DRAX Unit 10 DRAX Unit 12 +29 more YO8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3437.83 MW
Loading map...
Showing 25 locations