Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating Engines

21 unique locations (243 components)

Active MW: 0.00 MW
Inactive MW: 36.68 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (11 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (14 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks (2)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (9 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.75 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (11 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (7 components)

A gas engine CHP site providing steam and electricity to an industrial unit (3)

Reciprocating Engines Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU IMP_SPX CHP OSG_Aggregated +2 more GL51
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (10 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating Engines Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Kerfoot Power Kerfoot Power WA2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.68 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (10 components)

Combined Heat and Power Plant Olympic Park London (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.21 MW
Five Oaks Grid Substation Horsham Road Five Oaks Billinghurst, RH14 9AT (7 components)

4 x reciprocating engines (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (18 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (2)
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.48 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (14 components)
• 1.2 MW Combined Heat and Power Engine. (2)
• 1.6 MW Combined Heat and Power Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.86 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (8 components)

4 x reciprocating engines (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (8 components)

Gas Turbine CHP GT001A (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.88 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (4 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Barrow Man Road Birchington Kent CT7 0AX (9 components)

Two CHP engines in horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (18 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW (2)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.23 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (10 components)

Gas fired CHP (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
1 Thane Road West, Nottingham, NG2 3AA (36 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.32 MW
Loading map...
Showing 21 locations