Reciprocating Engines

2 unique locations (32 components)

Active MW: 0.00 MW
Inactive MW: 36.68 MW
International Conference Centre, Birmingham, B1 2EA (14 components)

1.6MW Combined Heat and Power at International Conference Centre (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.40 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (18 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW (2)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.23 MW
Loading map...
Showing 2 locations