Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating Engines

41 unique locations (423 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 36.68 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (11 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (14 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks (2)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (15 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (3)

Reciprocating Engines Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +3 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (9 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.75 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (11 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (7 components)

A gas engine CHP site providing steam and electricity to an industrial unit (3)

Reciprocating Engines Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU IMP_SPX CHP OSG_Aggregated +2 more GL51
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (10 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.91 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (3)

Reciprocating Engines CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1C-WA Glaxo Barnard Montrose Ware & Worthing +2 more SG12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Pandora Business Park Greengate Middleton Manchester M24 1RU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating Engines Reciprocating engines CONRAD (MIDDLETON JUNCTION) LIMITED New Build Generating CMU Middleton Junction Middleton Junction M24
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Old Church Lane Billericay CM13 1UP (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2020-21 (T-4)
M65, Accrington BB5 5WE (4 components)
• gas fired reciprocating engines (2)
• Gas fired reciprocating engines.
Active • 2024-25 (T-1), 2020-21 (T-4) ...
19.60 MW
London Rd, Purfleet RM19 1SD (11 components)

Gas-fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating Engines Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Kerfoot Power Kerfoot Power WA2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.68 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (5 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 1.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 4.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.10 MW
Land off Axe Road, Colley Lane Industrial Estate, Bridgwater, TA6 5LP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Reciprocating Engines Reciprocating engines CONRAD (BRIDGWATER) LIMITED New Build Generating CMU Bridgwater Bridgwater +1 more TA6
Active • 2024-25 (T-1), 2023-24 (T-4) ...
13.65 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (12 components)

Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear (3)

Reciprocating Engines Reciprocating engines CONRAD (LYTHAM) LIMITED Existing Generating CMU Amy Johnson Way Amy Johnson Way +1 more FY4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.81 MW
Land At Blacknell Lane Crewkerne Somerset TA18 8LL (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2020-21 (T-4)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (10 components)

Combined Heat and Power Plant Olympic Park London (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.21 MW
International Conference Centre, Birmingham, B1 2EA (14 components)

1.6MW Combined Heat and Power at International Conference Centre (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.40 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (10 components)

Indian Queens Power Station (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Harmire Road, Barnard Castle, County Durham, DL12 8DT (13 components)

On-site existing CHP generating unit (3)

Reciprocating Engines CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing +2 more DL12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Five Oaks Grid Substation Horsham Road Five Oaks Billinghurst, RH14 9AT (7 components)

4 x reciprocating engines (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations