Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

6 unique locations (19 components)

Active MW: 246.30 MW
Inactive MW: 0.00 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2027-28 (T-4), 2024-25 (T-1)
4.42 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• CMU is a photovoltaic system (2)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
Solar Photovoltaic BEECHGREEN ENERGYFARM LIMITED New Build Generating CMU Burwell EDFR Burwell +1 more CB25
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.76 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system (2)
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Solar Photovoltaic PORTH WEN SOLAR LIMITED New Build Generating CMU EDFR Porth Wen EDFR Porth Wen +1 more LL66
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.70 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Solar PV (2)
• Existing Solar PV
Solar Photovoltaic CBS SOLAR ASSETS UK LIMITED New Build Generating CMU 8RESAJ 8RESAJ BA12
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.94 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (3 components)

SolarPV generating station (3)

Solar Photovoltaic REGENT PARK ENERGY LIMITED Existing Generating CMU Ling Hall Solar Ling Hall Solar CV23
Active • 2025-26 (T-1), 2024-25 (T-1) ...
0.72 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system (2)
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Solar Photovoltaic HOLLYGREEN ENERGYFARM LIMITED New Build Generating CMU EDFR Sutton Bridge EDFR Sutton Bridge +1 more PE12
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.75 MW
Loading map...
Showing 6 locations