Solar Photovoltaic

7 unique locations (24 components)

Active MW: 246.30 MW
Inactive MW: 0.00 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm (2)
• Solar farm
Solar Photovoltaic Storage (Duration 1h) WARRINGTON RENEWABLES (HULL) LIMITED New Build Generating CMU BILTON FARM BILTON FARM HU11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.45 MW
Boscar Grange Farm York Yo61 3NQ (1 component)

Solar Farm consisting of solar PV modules and inverters

Solar Photovoltaic WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2024-25 (T-4)
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
• A transmission connected battery storage unit
• A transmission connected solar park.
Solar Photovoltaic Storage (Duration 2h) CLEVE HILL SOLAR PARK LIMITED New Build Generating CMU Cleve Hill A Cleve Hill B +1 more Not Prequalified CT5
Active • 2024-25 (T-4)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Solar Photovoltaic Storage (Duration 1h) PORTH WEN SOLAR LIMITED New Build Generating CMU North Anglesey Battery Storage Project North Anglesey Battery Storage Project +5 more Not Prequalified LL66
Active • 2024-25 (T-4), 2023-24 (T-4) ...
School Farm Solar Park, Watling Street, Churchover CP, Rugby, Warwickshie LE17 6RB (1 component)

A solar park.

Solar Photovoltaic SCHOOL FARM SOLAR PARK LIMITED New Build Generating CMU Churchover Not Prequalified LE17
Active • 2024-25 (T-4)
Woodington Road, Wellow, Test Valley, Hampshire, SO51 6DQ (1 component)

A 40MW solar park.

Solar Photovoltaic WOODINGTON SOLAR LIMITED New Build Generating CMU Woodington SO51
Active • 2024-25 (T-4)
Loading map...
Showing 7 locations