{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

15 unique locations (48 components)

Active MW: 246.30 MW
Inactive MW: 0.00 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (5 components)
• Solar PV generation site (2)
• SolarPV generating station
Active • 2026-27 (T-4), 2025-26 (T-1) ...
0.58 MW
Westfield Energy Limited, Lochgelly, Fife. (1 component) Geocoding Needed

Solar Farm

Solar Photovoltaic WESTFIELD ENERGY LIMITED Westfield Solar Not Prequalified
Active • 2026-27 (T-4)
1.36 MW
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian It is to be noted that for Grid Connection correspondence Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian was used as the site address . However, the project site`s pos (2 components) Geocoding Needed

Solar photovoltaic generation scheme connected to the distribution network (2)

Solar Photovoltaic ASE UK HOLDINGS LIMITED Trinlaymire Solar Trinlaymire Solar Rejected
Active • 2027-28 (T-4), 2026-27 (T-4)
3.39 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• CMU is a photovoltaic system (2)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.76 MW
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (3 components)
• CMU is a photovoltaic system (2)
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Solar Photovoltaic PORTH WEN SOLAR LIMITED EDFR Porth Wen EDFR Porth Wen +1 more LL66
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.70 MW
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import (2)
• Solar photovoltaic generation scheme connected to the distribution network
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (3 components)
• Solar PV (2)
• Existing Solar PV
Active • 2026-27 (T-4), 2025-26 (T-1) ...
1.94 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.. (2)

Solar Photovoltaic SSE UTILITY SOLUTIONS LIMITED Littleton Pastures Solar Littleton Pastures Solar WR11
Active • 2027-28 (T-4), 2026-27 (T-4)
2.49 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (3 components)

SolarPV generating station (3)

Solar Photovoltaic REGENT PARK ENERGY LIMITED Ling Hall Solar Ling Hall Solar CV23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4)
8.27 MW
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system (2)
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Solar Photovoltaic HOLLYGREEN ENERGYFARM LIMITED EDFR Sutton Bridge EDFR Sutton Bridge +1 more PE12
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.75 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.92 MW
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4)
10.58 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.32 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Loading map...
Showing 15 locations