Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

26 unique locations (65 components) - Page 1 of 2

Active MW: 246.30 MW
Inactive MW: 0.00 MW
Wraxall Manor Farm, Wraxall, Dorset, DT2 0HW. (1 component)

New build generating CMU component - solar photovoltaic park known as Higher Wraxall Solar Park

Solar Photovoltaic BRITISH SOLAR RENEWABLES LIMITED Higher Wraxall Solar Park Not Prequalified DT2
Active • 2027-28 (T-4)
0.64 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
4.42 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian It is to be noted that for Grid Connection correspondence Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian was used as the site address . However, the project site`s pos (2 components) Geocoding Needed

Solar photovoltaic generation scheme connected to the distribution network (2)

Solar Photovoltaic ASE UK HOLDINGS LIMITED Trinlaymire Solar Trinlaymire Solar Rejected
Active • 2027-28 (T-4), 2026-27 (T-4)
3.39 MW
Tarmac Quarry, Whisby, Lincoln, Lincolnshire, LN6 9BT (4 components)

New Build CMU comprising of Solar PV and associated plant (2)

Solar Photovoltaic CONRAD ENERGY (DEVELOPMENTS) II LIMITED Whisby North Whisby North +2 more Not Prequalified LN6
Active • 2028-29 (T-4), 2027-28 (T-4)
1.59 MW
Standingfauld Farm, Muthill, CRIEFF, Perthshire, PH5 2BS (1 component)

Solar PV Project

Solar Photovoltaic RELAY STANDINGFAULD LIMITED Relay Standingfauld Not Prequalified PH5
Active • 2027-28 (T-4)
0.89 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.43 MW
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import (2)
• Solar photovoltaic generation scheme connected to the distribution network
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Manor Farm, Burnett, Keynsham, Bristol, Somerset, BS31 2ED (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Solar Photovoltaic CONRAD ENERGY (DEVELOPMENTS) II LIMITED Keynesham Keynesham Not Prequalified BS31
Active • 2028-29 (T-4), 2027-28 (T-4)
2.21 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.. (2)

Solar Photovoltaic SSE UTILITY SOLUTIONS LIMITED Littleton Pastures Solar Littleton Pastures Solar WR11
Active • 2027-28 (T-4), 2026-27 (T-4)
2.49 MW
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (3 components)

SolarPV generating station (3)

Solar Photovoltaic REGENT PARK ENERGY LIMITED Ling Hall Solar Ling Hall Solar CV23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.92 MW
Land off torkington road, Hazel Grove, Greater Manchester, SK7 6NW (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Solar Photovoltaic CONRAD ENERGY (DEVELOPMENTS) II LIMITED Hazel Grove Hazel Grove Not Prequalified SK7
Active • 2028-29 (T-4), 2027-28 (T-4)
3.78 MW
2.66 MW
land at Keelings Road, Southminster, CM0 7JF (4 components)
• New build generating CMU component known as Dengie BESS (2)
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2027-28 (T-4), 2025-26 (T-1)
3.33 MW
Land At Glassthorpe Hill & Land Off Brington Road Flore Northamptonshire, NN7 3NF (2 components)

CMU is a photovoltaic system (2)

Solar Photovoltaic EDF ENERGY RENEWABLES LIMITED EDFR Glassthorpe EDFR Glassthorpe Not Prequalified NN7
Active • 2028-29 (T-4), 2027-28 (T-4)
5.17 MW
Land At, Elms Farm, Newbold Road, Newbold Pacey, Warwickshire, CV35 9DP (1 component)

A Solar site that will be situated on 5 fields and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC electricity, which will …

Active • 2027-28 (T-4)
1.27 MW
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.32 MW
Higglers Farm, Titchfield Lane, Wickham, Hampshire, PO17 5PQ (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2028-29 (T-4), 2027-28 (T-4)
8.48 MW
Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Solar Photovoltaic CONRAD ENERGY (DEVELOPMENTS) II LIMITED Landulph Solar Landulph Solar Not Prequalified PL12
Active • 2028-29 (T-4), 2027-28 (T-4)
6.30 MW
Ducklington Farm Course Hill Lane Ducklington Witney OX29 7YL (1 component)

A Solar site that will be situated on approximately 46 Hectares of land and comprise of mounted Silicon PV panels, String Inverters and Transformers. The PV panels will produce DC …

Active • 2027-28 (T-4)
1.14 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (4 components)

Solar PV generation site (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.60 MW
Belville Farm, Coldstream, Berwickshire, TD12 4JB (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

Solar Photovoltaic CONRAD ENERGY (DEVELOPMENTS) II LIMITED Coldstream Coldstream Not Prequalified
Active • 2028-29 (T-4), 2027-28 (T-4)
5.08 MW
Loading map...
Showing 25 locations