Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

1 unique locations (2 components)

Active MW: 246.30 MW
Inactive MW: 0.00 MW
High Garrett, Sisted, Braintree, Essex, CM77 8BX (2 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 … (2)

Solar Photovoltaic NEXTPOWER HIGH GARRETT LIMITED Existing Generating CMU High Garrett CM77
Active β€’ 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Loading map...
Showing 1 locations