Solar Photovoltaic

18 unique locations (75 components)

Active MW: 519.48 MW
Inactive MW: 1.66 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (5 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
34.27 MW
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (4 components)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021. (2)

Solar Photovoltaic NEXTPOWER SOUTH LOWFIELD LIMITED Existing Generating CMU South Lowfield DL7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.24 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED ALKANE ENERGY CM LIMITED New Build Generating CMU Offham Solar Offham Solar +1 more ME19
Active • 2027-28 (T-4), 2026-27 (T-1) ...
1.90 MW
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (4 components)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021.

Solar Photovoltaic NEXTPOWER LOWER STRENSHAM LIMITED Existing Generating CMU Lower Strensham WR8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.81 MW
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (4 components)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
11.65 MW
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (4 components)

A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.29 MW
Land lying between the villages of Mulbarton and Swainsthorpe, south of Norwich, NR14 8AJ (2 components)

CMU is a photovoltaic system

Solar Photovoltaic ASHGREEN ENERGYFARM LIMITED New Build Generating CMU EDFR Bloys Grove NR14
Active • 2027-28 (T-4), 2026-27 (T-1)
4.31 MW
land at Keelings Road, Southminster, CM0 7JF (6 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2029-30 (T-4), 2027-28 (T-4) ...
5.55 MW
Lakeshill Road, Worcestershire, WR11 8TS (3 components)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Solar Photovoltaic SSE RENEWABLES SOLAR & BATTERY HOLDINGS LIMITED New Build Generating CMU Littleton Pastures Solar Littleton Pastures Solar WR11
Active • 2028-29 (T-4), 2026-27 (T-1) ...
3.82 MW
High Garrett, Sisted, Braintree, Essex, CM77 8BX (4 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 …

Solar Photovoltaic NEXTPOWER HIGH GARRETT LIMITED Existing Generating CMU High Garrett CM77
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1.37 MW
Cotham Grange PV, Cotham Lane, HAWTON, Nottinghamshire, NG24 3RJ (4 components)

50 MW solar photovoltaic plant commissioned on 18/01/21.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.19 MW
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (4 components)
Solar Photovoltaic NEXTPOWER GRANGE LIMITED Existing Generating CMU The Grange NG24
Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.19 MW
Camela Lane, Camblesforth, North Yorkshire, England, YO8 8HA. (4 components)
• New Build Battery Storage
• New Build Solar PV
Solar Photovoltaic Storage (Duration 2.5h) CAMBLESFORTH SOLAR FARM LIMITED New Build Generating CMU Camblesforth Battery Storage YO8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.61 MW
Bosworth Solar Farm, Hall Farm, Newbold, Verdon, Leicestershire LE9 9NL (4 components)

The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims …

Active • 2029-30 (T-4), 2028-29 (T-4) ...
1.16 MW
Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL (4 components)
Solar Photovoltaic NEXTPOWER BOSWORTH LIMITED Existing Generating CMU Bosworth LE9
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1.16 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (5 components)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED REGENT PARK ENERGY LIMITED New Build Generating CMU Boston Solar Boston Solar +1 more PE21
Active • 2027-28 (T-4), 2026-27 (T-1) ...
1.69 MW
Bindwell Lane PV, Bindwell Lane, Queen Camal, Yeovil, BA22 7NF (3 components)

A 13 MWp solar PV site with a 9 MVA connection, currently under construction.

Solar Photovoltaic NEXTPOWER BINDWELL LIMITED New Build Generating CMU Bindwell BA22
Active • 2028-29 (T-4), 2026-27 (T-1) ...
1.56 MW
Loading map...