Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

10 unique locations (28 components)

Active MW: 519.48 MW
Inactive MW: 1.66 MW
Aldeby Landfill Site, Oaklands Gravel Pit, Common Road, Aldeby, Norfolk, NR34 0BD (1 component)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED New Build Generating CMU Aldeby Solar Not Prequalified NR34
Active • 2025-26 (T-4)
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (5 components)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED REGENT PARK ENERGY LIMITED New Build Generating CMU Boston Solar Boston Solar +1 more PE21
Active • 2027-28 (T-4), 2026-27 (T-1) ...
1.69 MW
Brogborough Landfill Site, Woburn Road, Brogborough, Bedfordshire, MK43 0TN (3 components)
• A 6MW Merlees diesel reciprocating engine connected to this distribution network
• Solar PV generation site
Solar Photovoltaic ALKANE ENERGY UK LIMITED New Build Generating CMU Brogborough Solar Not Prequalified MK43
Active • 2025-26 (T-4), 2020-21 (T-4) ...
Calvert Landfill Site, Creighton Road, Woodham, Buckinghamshire, HP18 0QW (1 component)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED New Build Generating CMU Calvert Solar Not Prequalified HP18
Active • 2025-26 (T-4)
Lower Litchardon Farm, Litchardon Cross, Newton Tracey, Barnstaple, Devon, EX31 3QE (1 component)

Solar photovoltaic generating station

Solar Photovoltaic ALKANE ENERGY UK LIMITED Existing Generating CMU Litchardon EX31
Inactive • 2023-24 (T-1)
1.66 MW
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED ALKANE ENERGY CM LIMITED New Build Generating CMU Offham Solar Offham Solar +1 more ME19
Active • 2027-28 (T-4), 2026-27 (T-1) ...
1.90 MW
Ongar Landfill Site, Mill Lane, Ongar, Essex, CM5 9RG (1 component)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED New Build Generating CMU Ongar Solar Not Prequalified CM5
Active • 2025-26 (T-4)
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU Stewartby Solar Conditional MK43
Active • 2025-26 (T-4), 2022-23 (T-4)
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s) (2)
• Solar PV generation site
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU SUTTONCOURTENAY Sutton Courtenay Solar Conditional OX14
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (5 components)
• Solar PV generation site (2)
• SolarPV generating station
Solar Photovoltaic ALKANE ENERGY UK LIMITED INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Winterton Winterton Bletchley +3 more DN15
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.58 MW
Loading map...
Showing 10 locations