Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)
Battery Storage (3)
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)
Battery Storage (3)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)
10MW battery energy storage facility at Upton Lane, Rownhams (3)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)
2MW BESS (3)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)
Storage facility (3)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
5MW, 1 hour/5MWh lithium-ion battery (3)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (3)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)
A new power plant, with associated civil works, switchgear and electrical connection. (3)
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
Milton Court Farm, Dorking, RH4 3LY (6 components)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)
The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (3)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components)
Battery Storage Plant (3)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)