Storage (Duration 1h)

37 unique locations (226 components) - Page 1 of 2

Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)

Storage facility

Inactive • 2022-23 (T-1)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site (2)
• A 45MWh New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
2.62 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.56 MW
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (4 components)
• 49MW Lithium-ion Energy Storage System (2)
• 49.9MW Lithium-ion Energy Storage System
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.28 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)

49.900MW/49.900MWh battery storage asset, 1 hour duration (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations