Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

41 unique locations (376 components) - Page 1 of 2

0.20 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Carlton, Stockton-on-Tees, TS21 1EA (9 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares …
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system …
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.94 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (2)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.28 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)

Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)

6.000MW of storage located at Westoning (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.11 MW
Loading map...
Showing 25 locations