Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

221 unique locations (1216 components) - Page 1 of 9

1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (12 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.80 MW
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)

45MW/45MWh BESS

Active • 2026-27 (T-4)
5.32 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.14 MW
0.20 MW
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Barton Hill Way, Torquay, TQ2 8JG (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.05 MW
Basing Road, Basingstoke, RG24 7AN (4 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
Active • 2025-26 (T-4)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm (2)
• Solar farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (9 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component)

60MW/60MWh BESS

Active • 2026-27 (T-4)
7.09 MW
Boscar Grange Farm York YO61 3NQ (5 components)

Battery Energy Storage system operating alongside solar farm (3)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
3.68 MW
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 component)

12MW Battery Storage located at Brindley Close in Swindon

Active • 2024-25 (T-4)
Bristol Avenue, Blackpool, FY2 0JF (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.87 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Active • 2028-29 (T-4)
1.05 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Loading map...
Showing 25 locations