8 unique locations (115 components)

Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
7.98 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
98.17 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.65 MW
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (1 component)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
15.28 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...