Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

16 unique locations (74 components)

Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (6 components)
• 6MW battery energy storage facility at Milton Court Farm, Dorking (2)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
• 10 MW Storage facility located at Balby, Doncaster. (2)
• 10 MW Storage facility
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 16 locations