Storage (Duration 1h)

32 unique locations (164 components) - Page 1 of 2

West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.20 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.64 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS (2)
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.00 MW
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

Active • 2025-26 (T-1)
5.98 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.02 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.34 MW
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Active • 2025-26 (T-1), 2024-25 (T-1) ...
6.07 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
• 50MW/50MWh one hour battery (2)
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.58 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
2.62 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
2.04 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 hour battery storage system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.17 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.33 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.28 MW
Land at West Road, Trafford Park, M41 7SW (7 components)

Battery Storage Station (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
• CMU ID 22GER4, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.63 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.81 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)

battery storage unit (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.22 MW
Loading map...
Showing 25 locations