Storage (Duration 1h)

135 unique locations (792 components) - Page 1 of 6

Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Welkin Road, Portwood, Stockport, SK6 2BH (1 component)

Battery Energy Storage System

Active • 2025-26 (T-4)
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Active • 2025-26 (T-4)
Tickhill Road, Maltby, S66 7QR (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (8 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS (2)
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.00 MW
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
5.89 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Active • 2025-26 (T-4), 2022-23 (T-4)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 component)

A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park

Active • 2025-26 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Loading map...
Showing 25 locations