Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (9 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.97 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (13 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 9.641 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.86 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.34 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.03 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.50 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (9 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (14 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.62 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (9 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.55 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (16 components)
• 17.315 MW installed capacity Battery Storage facility
• 19.6 MW Battery Storage facility
• 19.791 MW installed capacity Battery Storage facility
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.34 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (6 components)
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.82 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.01 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Active • 2028-29 (T-4), 2025-26 (T-1)
0.79 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (12 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.62 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (13 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.63 MW
Ipswich Road, Cardiff, CF23 9AQ (11 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
16.54 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (9 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (8 components)
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (18 components)
• 1.200MW of battery storage located at Preston.
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1693.31 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.01 MW