Storage (Duration 1h)

298 unique locations (1385 components) - Page 3 of 12

18.33 MW
Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
4.01 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Crossways, Greenhithe, DA9 9BB (3 components)
• A Battery Energy Storage System. (2)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
11.74 MW
Derehams Lane, Loudwater, High Wycombe, HP10 9RW (1 component)

40 MW/40MWh BESS located on an existing farm in Buckinghamshire, England

Active • 2025-26 (T-4)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
3.54 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)

49MW/49MWh BESS

Active • 2026-27 (T-4)
5.79 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.18 MW
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 component)

30.000 MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.89 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Feddal Battery Storage System, Feddal Estate, Dunblane, FK15 9RD (1 component)

9.999MW/9.999MWh greenfield BESS located approximately 3km West of Braco village, Dunblane, Scotland

Active • 2025-26 (T-4)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares …
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system …
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Loading map...
Showing 25 locations