Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

298 unique locations (1385 components) - Page 4 of 12

FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Active • 2024-25 (T-4)
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)

99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England

Active • 2025-26 (T-4)
Galaxy Business Park Blaydon-on-Tyne NE21 4NT (1 component)

A 99.8MW battery storage system comprising approx 13 battery skid units at Galaxy Business Park

Active • 2025-26 (T-4)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (2 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
0.71 MW
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Inactive • 2023-24 (T-1)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
2.64 MW
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

Active • 2025-26 (T-4), 2022-23 (T-1)
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.77 MW
Great Wheatley Road Rayleigh SS6 7AR (1 component)

4 x 2.5MW and 1 x 0.8MW BESS units installed on the site

Active • 2024-25 (T-4)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
• A new Build Generating Storage CMU (2)
• Existing Generating Storage CMU
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hales Lane Drax Selby YO8 8PL (1 component)

A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane

Active • 2025-26 (T-4)
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Active • 2025-26 (T-4), 2023-24 (T-1)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Active • 2024-25 (T-4), 2022-23 (T-4) ...
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)

1hr duration battery storage project. (2)

Active • 2025-26 (T-4), 2022-23 (T-1)
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 25 locations