Storage (Duration 1h)
220 unique locations (1115 components) - Page 5 of 9
Land off, Old School, Lane Hereford, HR4 9BP (3 components)
land off Lower Farm, Itchington, South Glos. BS35 3TH. (1 component)
A 49.400 MW / 49.400 MWh battery energy storage system located in land off Lower Farm, Itchington, South Glos. BS35 3TH.
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (4 components)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (1 component)
30MW/30MWh one hour battery storage asset located near BURWB1 asset
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)
New build storage facility (3)
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)
6.000MW of storage located at Westoning (3)
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (2 components)
new build battery storage asset 49.900MW/49.900MWh one hour duration (2)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)
New build battery storage 50.000MW/50.000MWh one hour duration asset (3)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 component)
49.9MW Battery Storage facility located at Capenhurst GSP
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)
40 MW/40MWh BESS (3)
Land at West Road, Trafford Park, M41 7SW (7 components)
Battery Storage Station (3)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
49.900MW/49.900MWh battery storage asset, 1 hour duration (3)
Land at Traston Road, Newport, NP19 4PW (1 component)
Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)
The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (3)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)
7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. (2)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)
CMU comprising of battery storage and associated plant (3)