Storage (Duration 1h)
299 unique locations (1486 components) - Page 9 of 12
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)
1hr Duration battery storage project. (2)
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)
1hr duration battery storage project. (2)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)
A Battery Energy Storage System
Hales Lane Drax Selby YO8 8PL (1 component)
A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane
Haigh Park Road, Stourton, Rothwell, Leeds, West Yorkshire. LS10 1RT (2 components)
A Battery Energy Storage System
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)
Battery Storage Plant (3)
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
Great Wheatley Road Rayleigh SS6 7AR (1 component)
4 x 2.5MW and 1 x 0.8MW BESS units installed on the site
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)
New build one-hour duration storage to replace diesel plant (2)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)
A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)
A Battery Energy Storage System (3)
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)
New Battery Storage Site comprising brand new batteries & inverters
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (8 components)
A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (3)
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (1 component)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)
Battery storage (3)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (3 components)
6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt (2)
Galaxy Business Park Blaydon-on-Tyne NE21 4NT (1 component)
A 99.8MW battery storage system comprising approx 13 battery skid units at Galaxy Business Park
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)
99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England
Forest Lane, Alne, York, YO61 1TU (1 component)
1x 2.000MW 1 hour Energy Storage System
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)
49.99MW Lithium-ion Energy Storage System (3)