Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

2 unique locations (5 components)

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

Storage (Duration 4h) DRAGONS LANE BATTERY STORAGE LIMITED New Build Generating CMU Dragon Lane CW11
Active • 2026-27 (T-4), 2023-24 (T-1)
12.98 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (3 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD New Build Generating CMU Cirencester Solar Farm Cirencester Solar Farm GL7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.69 MW
Loading map...
Showing 2 locations