Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

17 unique locations (56 components)

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified PE11
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK42
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM7
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CO4
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM6
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
LAND ON THE WEST SIDE OF MAIN ROAD, GRENDON, NORTHAMPTON, NN7 1JW. (Nearest postcode to grid reference: NN7 1JB). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) Storage (Duration 4h) GRENDON STORAGE LIMITED GRENDON STORAGE LIMITED New Build Generating CMU Grendon Storage 020 Grendon Storage 043 +6 more NN7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.44 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX1
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX34
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX5
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power Glowhouse Power Rejected PR26
Active • 2025-26 (T-1), 2024-25 (T-1)
4.48 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power Dellsome Power +1 more AL4
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (3 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD New Build Generating CMU Cirencester Solar Farm Cirencester Solar Farm GL7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.69 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK15
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Loading map...
Showing 17 locations