{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

85 unique locations (333 components) - Page 1 of 4

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 3h) Storage (Duration 4h) CONRAD (DUNKESWELL) LIMITED New Build Generating CMU Dunkeswell Dunkeswell +3 more EX14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK15
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 4h) CSE33 Limited New Build Generating CMU Bramford33 Rejected IP8
Active • 2027-28 (T-4)
122.81 MW
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (1 component)

New Build Battery Storage

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Buxton Road Not Prequalified SK17
Active • 2028-29 (T-4)
7.51 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (3 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD Existing Generating CMU New Build Generating CMU Cirencester Solar Farm Cirencester Solar Farm GL7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.69 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (1 component)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD New Build Generating CMU Cirencester Solar Farm GL7
Active • 2025-26 (T-4)
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dyche Lane Dyche Lane 2 Not Prequalified S18
Active • 2028-29 (T-4)
28.21 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power Dellsome Power +1 more AL4
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) REAY POWER LIMITED New Build Generating CMU Reay Reay 2 Rejected KW14
Active • 2028-29 (T-4)
21.31 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

Storage (Duration 4h) DRAGONS LANE BATTERY STORAGE LIMITED New Build Generating CMU Dragon Lane CW11
Active • 2026-27 (T-4), 2023-24 (T-1)
12.98 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4)
171.47 MW
Eccles Birgham Farm, TD12 4LU (2 components)
• Lithium ion battery storage plant
• Lithium ion battery storage plant.
Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 1 Kilmarnock South unit 2 TD12
Active • 2027-28 (T-4)
30.78 MW
Eccles Birgham Farm, TD12 4LU. (1 component)

Lithium ion battery storage plant.

Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 3 TD12
Active • 2027-28 (T-4)
15.39 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (1 component)

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Fibden Farm Not Prequalified WR9
Active • 2028-29 (T-4)
16.70 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power Glowhouse Power Rejected PR26
Active • 2025-26 (T-1), 2024-25 (T-1)
4.48 MW
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified L30
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Loading map...
Showing 25 locations