Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

43 unique locations (256 components) - Page 1 of 2

Woodend Farm, Bigrigg, Cumbria, CA22 2TA (7 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (6 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (5 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (5 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (5 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (5 components)
• 0.500MW Battery Energy Storage System
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (14 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (6 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (6 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (9 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (9 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (5 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (4 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (4 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (6 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Lookabootye Broxburn West Lothian EH52 5PD (7 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 25 locations