Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

105 unique locations (590 components) - Page 1 of 5

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)

Battery Energy Storage System

Inactive • 2022-23 (T-4)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Active • 2025-26 (T-4), 2022-23 (T-4)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 25 locations