101 unique locations (612 components) - Page 1 of 5

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (8 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of a battery storage asset
Active • 2024-25 (T-4), 2023-24 (T-4) ...
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready …

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System
• A New Build 2.5MW Generation Battery Site
• A New Build Generation Battery Site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (3 components)

Battery Energy Storage System

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Amersham Road Denham Buckinghamshire SL9 7AW (7 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Back Lane, Chesterfield, S44 5XQ (10 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
• A Battery Energy Storage System.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.72 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (6 components)

Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (9 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (4 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (10 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (8 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Inactive • 2022-23 (T-4)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (8 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (12 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Clay Tye Road, Upminister, RM14 3PL (8 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Active • 2025-26 (T-4), 2024-25 (T-4) ...
36.65 MW
Crossways, Greenhithe, DA9 9BB (3 components)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (44 components)
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• BM Unit T_FFES-2 at Ffestiniog Power Station (Pumped Storage).
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage).
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Glyn Rhonwy Pumped Storage Facility, Ffordd Clegir, Caernarfon, Gwynedd LL55 4EL Note: The site is currently brown field with no ability to receive post. As such this address uses the nearest current postcode. (12 components)
• 49.950 MW pumped storage facility in Gwynedd, North Wales.
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (13 components)
• A new Build Generating Storage CMU
• Existing Generating Storage CMU
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations