Storage

88 unique locations (752 components) - Page 1 of 4

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System (2)
• A New Build 2.5MW Generation Battery Site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive • 2023-24 (T-4)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Inactive • 2023-24 (T-4)
Crossways, Greenhithe, DA9 9BB (3 components)
• A Battery Energy Storage System. (2)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eggborough CRYOBattery Limited Eggborough Power, Entrance 1 Eggborough GOOLE DN14 0BS United Kingdom (2 components)

49.454 MW generator powered by cryogenic air expanded through a turbine with 250MWh of stored energy (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (44 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage) (3)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage) (2)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (39 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage) (2)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
• A new Build Generating Storage CMU (2)
• Existing Generating Storage CMU
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations