Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Active • 2024-25 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (3 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection. (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (8 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Stonehill, Charlton, Malmesbury, SN16 9RP (1 component)

49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

Active • 2024-25 (T-4)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.93 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1.46 MW
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Redcoat Lane, Kirkstall, LS4 2AL (1 component)

100MW storage unit

Active • 2024-25 (T-4)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
Active • 2024-25 (T-4), 2024-25 (T-1) ...
7.40 MW
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System, which has already PQ'd as POTM25
Active • 2025-26 (T-4), 2024-25 (T-4) ...