Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Worset Lane Hartlepool TS27 3BL (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 37.5 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2025-26 (T-4)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (9 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (4 components)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
3.72 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (25 components)
• West Burton B Power Station CMU 1 WB1-22= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 3 WB3-17= 100% T_WBURB-3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Active • 2025-26 (T-4)
Tickhill Road, Maltby, S66 7QR (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
the land to the south west of Middleton Road, Middleton, Morecambe extending to approximately 3 acres (1 component)

75.00 MW of Battery Energy Storage Units with associated infrastructure.

Active • 2025-26 (T-4)
The Hollies Croft Skegness Lincolnshire PE24 4SH (1 component)

20MW-40MWh Battery Energy Storage system. Number of Inverters/skid: 6 x 3950kVA UP-XT/MVPS 4600S2 @ 25C Number of Electric combiner Box: 12 Number of battery box: 24

Active • 2025-26 (T-4)
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (9 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.43 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (8 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.44 MW
Loading map...
Showing 25 locations