Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)

The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.

Active • 2027-28 (T-4)
5.54 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Active • 2027-28 (T-4)
4.31 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Active • 2027-28 (T-4)
10.77 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
1.64 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
• 247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
• 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
Active • 2027-28 (T-4)
114.05 MW
Tyne Tunnel Industrial Estate, North Shields, Tyne & Wear, NE29 7SE (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.34 MW
3.46 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
92.03 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.23 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.18 MW
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (3 components)

1.200MW BESS (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.14 MW
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (1 component)

BESS project to be installed within a future Greener Grid Park.

Active • 2027-28 (T-4)
31.13 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
86.18 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
5.23 MW
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

Active • 2027-28 (T-4)
31.54 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW