Storage

3 unique locations (10 components)

LAND SOUTH WEST OF COWLEY SUBSTATION, NUNEHAM COURTENAY, OXFORD, OX44 9PA (1 component)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4)
8.89 MW
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (1 component)

Lithium-based battery energy storage system

Active • 2025-26 (T-1)
13.58 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Loading map...
Showing 3 locations