Storage

944 unique locations (2934 components) - Page 1 of 38

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
4.19 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (1 component)

98 MW BESS

Active • 2028-29 (T-4)
15.46 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 To 17 Inclusive, Titan Drive, Peterborough, PE1 5XN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
288 And 290 Hillgrounds Road Kempston Bedford MK42 8SZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2027-28 (T-4)
3.08 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Active • 2028-29 (T-4)
8.90 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
3.53 MW
A981, Fraserburgh, Aberdeenshire, Scotland, AB43 7FW, United Kingdom (1 component)

A new build 45MW / 90MWh battery energy storage system

Active • 2027-28 (T-4)
4.16 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Aber Park Road, Flint Flintshire CH6 5EX (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW