Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

321 unique locations (762 components) - Page 10 of 13

NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Old Trimpell Refinery Site Middleton Road Middleton Heysham LA3 3NT (2 components)

24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Orchard Bank Industrial Estate Forfar DD8 1TD (1 component)

9.999 MW battery storage located at Forfar.

Inactive • 2021-22 (T-4)
Outram Road, Dukinfield, SK16 4XE (1 component)

Battery Storage Facilty

Battery Storage STOR 140 Ltd Not Prequalified SK16
Inactive • 2021-22 (T-4)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (2 components)

20 MW storage battery (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Perimeter Road, Liverpool, L33 3AF. (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.

Inactive • 2021-22 (T-4)
Perseverance Road, Hereford, UK, HR4 9SE (1 component)

A 8MW New Build Battery Storage Site

Inactive • 2022-23 (T-4)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• A Battery Energy Storage System (2)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Port of Tilbury, Tilbury, RM18 7EH (2 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Power House Road Birkenhead Wirral CH62 0AZ (2 components)
• 20MW Gas Reciprocating Engines envisaged to be made up of multiple modules
• 28MW BESS envisaged to be installed in multiple modules operated at 8MW
Inactive • 2021-22 (T-4)
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (2 components)

This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear … (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Queenborough Road, Sheerness ME12 3RL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (2 components)

1.5MW battery located in Southampton (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Rainworth Colliery, Rainworth, Mansfield, NG21 0HR (2 components)

battery storage with other generation (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Rampisham Down Maiden Newton Dorchester DT2 0HS (1 component)

A 3.5MW Energy storage system located at Dorchester.

Inactive • 2021-22 (T-4)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations