Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 10 of 51

Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (3 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
498.79 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
25.07 MW
Sefton Lane, Liverpool, L31 8BX. (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2021-22 (T-4)
SEC, Stobcross Road, Scottish Event Campus, Stobcross, Glasgow, G3 8DG (2 components)

60MW / 60MWh BESS

Active • 2026-27 (T-4)
14.17 MW
Seacroft Caravan Club, Cromer Road, East Runton, Cromer NR27 9NH (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2027-28 (T-4)
5.75 MW
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Active • 2026-27 (T-4)
0.30 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.78 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (2 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
33.39 MW
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (1 component)

New Build Generation CMU - Battery Energy Storage System.

Active • 2028-29 (T-4)
18.22 MW
Sanquhar II Sanquhar Dumfries and Galloway DG4 6LF (1 component)

250 MW 2h BESS (on Day 1) that is entered at 217 MW 2h to account for degradation through 15year life.

Active • 2027-28 (T-4)
33.40 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Active • 2025-26 (T-4), 2024-25 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (2 components)

0.1MW Tesla battery located at Eversham (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Saint Mary's Lane, Monks Farm, London Borough of Havering, London, Thurrock, Greater London, England, CM13 3EL, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
61.25 MW
Ryton Industrial Estate Blaydon NE21 4NT (1 component)

2 hour containerised battery storage

Active • 2028-29 (T-4)
10.47 MW
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
3.55 MW
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Rusholme Grange, Drax, YO8 8PW (4 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.96 MW
Rusholme Grange, Drax, Selby, YO8 8PW (1 component)

The CMU component at Rusholme Grange is an energy storage system comprised of Lithium-ion batteries. The system will have a 35 MW export capacity and an import capacity of 36.8 …

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations