Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 11 of 51

Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
Active • 2026-27 (T-4), 2025-26 (T-4)
7.46 MW
Rugeley Power Station Rugeley Staffordshire WS15 1PR (1 component)

Rugeley battery storage system at Rugeley Power Station

Inactive • 2021-22 (T-4)
Royle Farm, Burton upon Trent, Derbyshire, DE15 9TU (1 component)

Containerised battery storage asset, 2 hour duration

Active • 2026-27 (T-4)
21.27 MW
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 component)

A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park

Active • 2025-26 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.02 MW
Roundswell Business Park, Barnstable, Devon EX31 3TD (1 component)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (3 components)
• A 10MW New Build Battery Storage Site (2)
• A 10MW Existing Generating Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (2 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Riverside Way, Barrowford, Lancashire BB9 6DN (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ripon Street, Attercliffe, Sheffield, S9 3NE (1 component)

The CMU component at the Sheffield Central Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2021-22 (T-4)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.34 MW
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Active • 2025-26 (T-1), 2024-25 (T-1) ...
6.07 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Red Scar Business Park Longridge Road Preston PR2 5NQ (2 components)
• battery storage with other generation to extend operating time
• battery storage with other generation to extend operation time
Battery Storage HC ESS4 LIMITED Not Prequalified PR2
Inactive • 2021-22 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Redcoat Lane, Kirkstall, LS4 2AL (1 component)

100MW storage unit

Active • 2024-25 (T-4)
Loading map...
Showing 25 locations