Storage
321 unique locations (762 components) - Page 12 of 13
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)
Storage facility
Sub Station, Percival Lane, Runcorn, Cheschire WA7 4DS (2 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)
Sunnydale Farm Smeeton Road Saddington Leicester LE8 0QT (1 component)
A 4.45MW Energy storage system located at Leicester.
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)
battery storage (3)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)
2MW BESS (3)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)
A new power plant, with associated civil works, switchgear and electrical connection. (2)
The Emirates Stadium, Hornsey Rd, London N7 7AJ (4 components)
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)
50 MW Storage facility located at Thurcroft. (2)
Thelwall Lane, Warrington, WA4 1PD (2 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)
Battery Energy Storage System
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (2 components)
0.9MW Battery storage located at Hampshire (2)
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (2 components)
4MW BESS (2)
The Street, Hacheston, IP13 9ND (4 components)
battery storage (2)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
Tiddlywink Yatton Keynell Chippenham Wiltshire SN14 7BY (1 component)
New Build Generating CMU comprising of a battery storage asset
Timsbury Manor, Romsey SO51 0NE (1 component)
Lithium ion battery operating as a power plant. Change of use from redundant quarry.
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)
New build one-hour duration storage to replace diesel plant
Transport Yard, Parsonage Street, Oldbury, B69 4PH (4 components)
Trent Basin Nottingham NG2 4DS (2 components)
A 0.5MW Lithium Ion Battery based in Nottingham (2)
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (3 components)
The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of … (3)
Twibell Street, Barnsley S71 1JE (2 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)
Unit 10 Ventura Business Park Carterton OX18 1AD (1 component)
A 7MW Energy storage system located at Carterton
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)
Energy storage system providing capacity market, dynamic FFR and other balancing services.
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)
The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …