Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

1265 unique locations (3870 components) - Page 13 of 51

Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Plot Aii Queensway Hadley Telford TF1 7AF (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Active • 2026-27 (T-4)
7.11 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (3 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Active • 2024-25 (T-1), 2023-24 (T-1)
36.65 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (4 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• A Battery Energy Storage System (2)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Persley Croft, The Parkway, Aberdeen, AB22 8AN (1 component)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
19.79 MW
Persley Croft, The Parkway, Aberdeen AB22 8AN (1 component)

CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN

Active • 2027-28 (T-4)
9.09 MW
Perseverance Road, Hereford, UK, HR4 9SE (1 component)

A 8MW New Build Battery Storage Site

Inactive • 2022-23 (T-4)
Perimeter Road, Liverpool, L33 3AF. (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.

Inactive • 2021-22 (T-4)
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (2 components)

20 MW storage battery (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Part Of Stafford Park 7 Telford TF3 3BQ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Loading map...
Showing 25 locations