Storage

944 unique locations (2934 components) - Page 3 of 38

Verge at Tongwell Lake Car Park, Yeomans Drive, Blakelands, MK14 5LR (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at the end of Fingle Drive, Stonebridge, MK13 0DN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Surrey Fire and Rescue Headquarters, Wray Park Road, Reigate Road, RH2 0EH (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Succomb's Hill, by Wapses Lodge Roundabout, Caterham, CR3 0BL (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Soskin Drive Car Park, Stantonbury Fields, MK14 6DT (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Phoenix Road / Hadenham Road Junction, Lowestoft NR33 7NF (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Oldbrook Boulevard, Nr Rhodes Place, Milton Keynes, MK6 2LU (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Verge at Godstone Fire Station, Fosterdown, Godstone, RH9 8BQ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (2 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
20.10 MW
Units 2, 3, 4 And 4A Kinmel Park Industrial Estate, Bodelwyddan, LL18 5TY (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Units 1 And 2, Brook Hill Industrial Estate, Plymouth Avenue, Pinxton, Nottingham, NG16 6RA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.64 MW
Unit 3, Honeyborough Industrial Estate, Neyland, Milford Haven, SA73 1SE (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Unit 2, Cunliffe Site, Industrial Estate Road, Llangefni, LL77 7JA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Active • 2024-25 (T-4)
Unit 10 Homefield Road, Haverhill CB9 8QP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.47 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 component)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
5.22 MW
Loading map...
Showing 25 locations