Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage

321 unique locations (762 components) - Page 3 of 13

Station Road Long Sutton Spalding PE12 9BS (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Spark Street, Grimsby, DN34 4JJ (1 component)

The CMU component at Spark Street is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Inactive • 2021-22 (T-4)
South Kirkby Business Park South Kirkby Pontefract WF9 3SU (1 component)

15 MW Storage facility located at South Kirkby, Pontefract.

Inactive • 2021-22 (T-4)
Severn Way, Berkeley GL13 9TN (2 components)

This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network … (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Sefton Lane, Liverpool, L31 8BX. (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2021-22 (T-4)
Salford Lodge Pitchill Evesham WR11 8SN (2 components)

0.1MW Tesla battery located at Eversham (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Rusholme Grange, Drax, Selby, YO8 8PW (1 component)

The CMU component at Rusholme Grange is an energy storage system comprised of Lithium-ion batteries. The system will have a 35 MW export capacity and an import capacity of 36.8 …

Inactive • 2021-22 (T-4)
Rugeley Power Station Rugeley Staffordshire WS15 1PR (1 component)

Rugeley battery storage system at Rugeley Power Station

Inactive • 2021-22 (T-4)
Roundswell Business Park, Barnstable, Devon EX31 3TD (1 component)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (3 components)
• A 10MW New Build Battery Storage Site (2)
• A 10MW Existing Generating Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (2 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Riverside Way, Barrowford, Lancashire BB9 6DN (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ripon Street, Attercliffe, Sheffield, S9 3NE (1 component)

The CMU component at the Sheffield Central Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2021-22 (T-4)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Red Scar Business Park Longridge Road Preston PR2 5NQ (2 components)
• battery storage with other generation to extend operating time
• battery storage with other generation to extend operation time
Battery Storage HC ESS4 LIMITED Not Prequalified PR2
Inactive • 2021-22 (T-4)
Ravenshaw Way, Solihull B91 2SU (1 component)

CMU consists of Stationary Lithium ion Battery with ability to export or import 10MW via grid site connection

Inactive • 2021-22 (T-4)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rampisham Down Maiden Newton Dorchester DT2 0HS (1 component)

A 3.5MW Energy storage system located at Dorchester.

Inactive • 2021-22 (T-4)
Rainworth Colliery, Rainworth, Mansfield, NG21 0HR (2 components)

battery storage with other generation (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (2 components)

1.5MW battery located in Southampton (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations